Post Implementation Review of Luton Airport’s Runway 26 departure routes airspace change proposal

The UK Civil Aviation Authority (CAA) has now completed a thorough review of changes made in 2015 to Luton Airport’s Runway 26 departure routes. We have assessed these changes against the original objectives of the airspace change proposal. This review concludes that the airspace change has been implemented and is operating as expected. This report marks the end of this airspace change request.

The report can be accessed through the following link: Report of the CAA’s Post Implementation Review of London Luton Airport’s Airspace Change Proposal – Runway 26 Brookmans Park RNAV-1 Standard Instrument Departure Procedures